Artesian Road Pipeline
In order to increase service
and anticipate future building developments,
Olivenhain Municipal Water District
recently designed the Artesian Road
Pipeline, calling upon IEC to perform
inspection and construction management
services.
The project consisted of five
parallel pipelines including 24-to-27-inch
welded steel pipe, 10-to-16-inch
PVC pressure pipe, one sewer force
main, and 10-inch HDPE pipe, for
a total of nearly 10,000 linear
feet of pipe. A portion of this
pipeline includes 180 linear feet
of jack-and-bore steel casing. Coordination
with the District and preparation
of materials helped to complete
multiple tie-ins simultaneously.
SDCWA permits had to be acquired
and onsite water ponds adjacent
to jack-and-boring created an additional
need for SWPPP management. |