IEC prepared plans, specifications, and estimates for the design of the North Twin Oaks Pump Station, which will serve the Twin Oaks Reservoir and North Twin Oaks Tanks 2 and 3. The pump station will supply 2.75mgd (1900gpm) of potable water.  The project also involves expanding an existing pump station building, adding an emergency generator, and maintaining service to an existing critical facility.

North Twin Oaks Pump StationInside North Twin Oaks Pump Station.

North Twin Oaks Pump Station North Twin Oaks Pump Station

• Expanded pump station to include new electrical service

• Added three new vertical turbine pumps

• Added standby power

• Interfaced with existing telemetry system