Projects

City of Carlsbad
City of National City
City of Vernon
City of Vernon UWMP
Rincon del Diablo MWD
San Luis Rey MWD
Vallecitos Water District

IEC was selected to perform a water distribution system hydraulic analysis for the City of Vernon. This project included the development and calibration of a water system hydraulic model that was used to evaluate the feasibility of removing the City’s only reservoir from the water distribution system. The results of the hydraulic analysis were then used to determine the improvements necessary for the City to operate a closed system.


The City of Vernon water model that IEC developed by importing the City’s existing water system GIS database into H2OMap Water.